Dual Fuse® operation is supported by essential auxiliary equipment:
Weigh Frame
The Weigh Frame designed according to ISO standard 668, is a framework designed to support the Dual Fuse® container when it stands in the vertical plane and comes complete with removable load cell and a 12” Dial. The Dual Fuse® is locked onto the Weigh Frame via its corner castings and the Iso twist locks incorporated into the Weigh Frame design.
Rig Installation Module
The DNV 2.7.3 certified, Dual Fuse® Rig Installation Module (DIM) (also referred to as ‘RIM’ (Rig Installation Module) or Rig Piping Interface Module) is a purpose designed module that is transported to Rigs where it is placed at the foot of each Dual Fuse® container.
The DIM or otherwise called RIM module is effectively a piping manifold assembly complete with walkway grating and handrails for added operational safety that brings together all pipes that are essential for the operation of the Dual Fuse tank container including material to be loaded, compressed air, control air. It is for this reason that a Dim is placed at the foot of each Dual Fuse tank container.